instructions for completing bituminous

instructions for completing bituminous

  • 19PSX0261‐ Bituminous Concrete Materials and Bridge Deck ...

    19PSX0261‐ Bituminous Concrete Materials and Bridge Deck Membrane Waterproofing (Complete‐in‐Place) Instructions when completing Exhibits B1, B2 B3 ‐ Price Schedules 1. Please complete and submit Exhibit B1 B2, Price Schedules. Failure to do so will result in rejection of your bid. 2. Bidders shall confirm that their US DOT Number ...

  • Application Instructions for BP Asphalt Shingles from Canada

    Asphalt Shingles. Asphalt Shingles; Manoir; Everest 42; Mystique 42; Yukon SB; Dakota; Cedar Shingles; Accessories; Documentation. Asphalt Shingles. Technical. Data Sheets; Application Instructions ; Material Safety Data Sheets; Guarantee. BP Standard System; Higher Wind/Rain Resistance; Lower Installation Cost; Brochures; About Us; Contact; Français/Español; Asphalt

  • APPLIC ATION INSTRUCTIONS - BP Canada

    APPLIC ATION INSTRUCTIONS ASPHALT SHINGLES March 2016 5 may be installed using special application instructions outlined in Section 3.3. For slopes equal or greater than 4/12, all BP shingles can be installed. Asphalt Shingles can not be installed on roof slopes below 2/12. Please refer to Table 2 found in Section 3.2. 2.2 – DECK The deck must be in good condition. It must be dry, clean ...

  • The Complete 7-Step Process for Asphalt Pavement Installation

    Demolition and Removal. The first step in the asphalt installation process is to remove the existing
  • 18PSX0321- Bituminous Concrete Materials and Bridge Deck ...

    18PSX0321- Bituminous Concrete Materials and Bridge Deck Membrane Waterproofing (Complete -in-Place) Instructions when completing Exhibits B1 , B2 B3 - Price Schedules . 1. Please complete and submit Exhibit B1 B2, Price Schedules . Failure to do so will result in rejection of your bid. 2.

  • Installation of Asphalt Shingles on Low Sloped Roofs - CASMA

    Asphalt shingles are an effective roof covering material for sloped roofs that can be successfully used on slopes as low as 2:12. With respect to shingle application, roof slopes from 2:12 to less than 4:12 (18.5°) are called “low slope” roofs, while roof slopes of 4:12 or greater are called ‘’normal’’ or ‘’standard’’ slopes.

  • Bituminous Machine Alpine Products, Inc.

    Bituminous Machine. Price: Please Call. Product Description. SCOPE 1.0 The following are standard specifications for a buggy type bitumen-type marker adhesive applicator capable of heating and dispensing thermal adhesive bitumen-type material at approximately 425 degrees on roadways. BUGGY FRAME 2.0 The frame is constructed of 1″ x 2″ x 14 gauge structural tubing with miter joints and full ...

  • How to Install Asphalt Shingles - Roof Shingles ...

    Complete the application of underlayment and valley flashing before the roofing shingles are applied. The recommended flashing material is a 28-gauge galvanized metal or an equivalent corrosion resistant, non-staining material (check with local codes). Center a 914 mm (36″) width strip of an ice and water protector membrane in the valley.

  • Bituminous Mastic - Bostik

    Bituminous Mastic for Roofs in a warm room overnight prior to use. APPLICATION 6. Stir well before use. 7. Apply with a steel trowel or putty knife. Cracks/Holes: For any application not covered please contact Technical 8. Force Bostik Bituminous Mastic for Roofs into the crack, covering over the area to be treated by 25mm either side, at a thickness of 3mm. 9. For large cracks and holes apply ...

  • Bituminous Felt Adhesive - Bostik

    The felt should be overlapped: side laps minimum 75mm, and end laps minimum 150mm, and the laps sealed with Bostik Bituminous Felt Adhesive for Roofs. 10. When laying the felt it is important to ensure that no air is trapped underneath, particularly when laid over a previous layer of felt or other waterproof coating. 11.

  • Application Instructions for BP Asphalt Shingles from Canada

    Asphalt Shingles. Asphalt Shingles; Manoir; Everest 42; Mystique 42; Yukon SB; Dakota; Cedar Shingles; Accessories; Documentation. Asphalt Shingles. Technical. Data Sheets; Application Instructions ; Material Safety Data Sheets; Guarantee. BP Standard System; Higher Wind/Rain Resistance; Lower Installation Cost; Brochures; About Us; Contact; Français/Español; Asphalt

  • Landmark Roofing Shingles - CertainTeed

    With a dual-layered design that emulates the dimensionality of true wood shake, Landmark asphalt shingles offer the heaviest weight and widest array of color options in their class, allowing you to create or re-create the ideal look for your home with confidence. Backed by a 100+ year legacy of trusted manufacturing performance, all Landmark shingles include CertainTeed’s industry-leading ...

  • How to Install Asphalt Shingles - Roof Shingles ...

    Complete the application of underlayment and valley flashing before the roofing shingles are applied. The recommended flashing material is a 28-gauge galvanized metal or an equivalent corrosion resistant, non-staining material (check with local codes). Center a 914 mm (36″) width strip of an ice and water protector membrane in the valley. The product is tacked in place temporarily along one ...

  • Instructions for Completing the General Permit ...

    Use these instructions to complete the registration form for the General Permit for Storage and Processing of Asphalt Roofing Shingle Waste (ARSW) for Beneficial Use and Recycling (DEP-RCY-REG-011). These instructions are not a substitute for the requirements of any relevant statutes or regulations. You should review all applicable laws prior to completing the registration form.

  • 07 13 19 - Modified Bituminous Sheet Waterproofing

    Modified bituminous sheet waterproofing will be measured for payment by the square yard (square) or square foot complete in place. b. Adhesives, fasteners, protection board, and accessories will not be measured separately for payment; such items will be considered incidental to the modified bituminous sheet waterproofing work and included in the measurement specified above. MODIFIED BITUMINOUS ...

  • Laminate Shingle Installation Instructions

    3 MALARKEY LAMINATE SHINGLE INSTALLATION INSTRUCTIONS Properly Driven Improperly Driven Asphalt shingles Decking Underdriven ⅜" (10 mm) min. diameter Straight, good penetration, and flush with shingle surface. Inadequate deck penetration. Too deep, cuts into shingle. Inadequate anchorage. Overdriven Crooked Figure 5 - Nailing Instructions

  • Instructions for Supplemental Permit Application Form ...

    Instructions for Attachment E208 CONCRETE, ASPHALT CONCRETE, MINERAL PROCESSING OR OTHER SIMILAR EQUIPMENT Supplemental Application Form (Instructions for Completing DEEP-NSR-APP-208) All applications for a permit to construct and operate a stationary source shall include the information listed in Regulations of Connecticut State Agencies (RCSA) section 22a-174-3a(c). This

  • Cold Weather Application Recommendations for Modified ...

    2020-04-20  For all cold weather applications, follow the manufacturer’s installation instructions as they pertain to cold weather application and temperature limitations. Never throw or drop rolls of material. Should wrinkling of roll goods occur during installation, unroll and cut the material, typically in lengths of halves or thirds, and allow the cut pieces to relax before application. The time ...

  • Bitumen Burns Cards - AAPA

    Order Bitumen Burns Cards for your team by completing the below form. Bitumen Burns Cards are an essential safety tool for anyone operating close to road surfacing. The Bitumen Burns Card is endorsed by the Australian New Zealand Burn Association and provides advice to Medical Professionals regarding treatment.

  • Standard Practice for Sampling Bituminous Materials1

    with instructions for use is shown in Fig. 2. NOTE 2—Most bituminous materials in the liquid state are of such viscous and adhesive character that, after normal emptying of a container by pouring, the container retains enough material to cause significant contamination of any second samples secured before the container was thoroughly cleaned. The aforementioned properties of bituminous mate ...

  • Instructions for Completing the General Permit ...

    Use these instructions to complete the registration form for the General Permit for Storage and Processing of Asphalt Roofing Shingle Waste (ARSW) for Beneficial Use and Recycling (DEP-RCY-REG-011). These instructions are not a substitute for the requirements of any relevant statutes or regulations. You should review all applicable laws prior to completing the registration form.

  • Laminate Shingle Installation Instructions

    3 MALARKEY LAMINATE SHINGLE INSTALLATION INSTRUCTIONS Properly Driven Improperly Driven Asphalt shingles Decking Underdriven ⅜" (10 mm) min. diameter Straight, good penetration, and flush with shingle surface. Inadequate deck penetration. Too deep, cuts into shingle. Inadequate anchorage. Overdriven Crooked Figure 5 - Nailing Instructions

  • Asphalt roof shingles 10+ ideas in 2020 asphalt roof ...

    Apr 14, 2020 - Explore Charity Collins's board "Asphalt roof shingles" on Pinterest. See more ideas about Asphalt roof shingles, Roof shingles, Shingling.

  • 19 pins
  • Instructions for Supplemental Permit Application Form ...

    Instructions for Attachment E208 CONCRETE, ASPHALT CONCRETE, MINERAL PROCESSING OR OTHER SIMILAR EQUIPMENT Supplemental Application Form (Instructions for Completing DEEP-NSR-APP-208) All applications for a permit to construct and operate a stationary source shall include the information listed in Regulations of Connecticut State Agencies (RCSA) section 22a-174-3a(c). This

  • RIICBS410A Apply the principles for the manufacture of ...

    2.2.Ensure clear and timely instructions are communicated to team members and others involved, for the safe, effective and efficient conduct of the tasks, to meet the specific task requirements 3. Oversee the execution of tasks 3.1.Monitor the manufacture of bituminous emulsion performance to ensure it achieves the required outcomes 3.2.Initiate adjustments to work practice or job plan to ...

  • Two component bituminous liquid for use with Proofex systems.

    Two component bituminous rubber emulsion with special hydraulically hardening fillers. Properties. Consistency: Paste-like (mixture) Density: Approximately 1.2 g/cm³ (mixture) while fresh: Pot life: Approximately 90 minutes at +20ºC. Application temperature: Approximately: minimum +5ºC up to +35ºC ambient temperature: Primer: Mixed material diluted with water 1:10: Curing: 1 to 3 days ...

  • PermaFlash Bituminous Flashing System Penetration Flashing ...

    PermaFlash™ Bituminous Flashing System - Penetration Flashing Instructions RS-4095 6-09 (Replaces 12-08) Ensure all surfaces are clean, dry and free of any loose debris, dust, dirt and rust before coating. 1. Items you will need: • MBR® Flashing Cement Cartridges • Applicator (Gun), Nozzle and Restrictor • PermaFlash Primer • PermaFlash Scrim • Scissors • Masking Tape • Brush ...

  • Eterno Ivica - accessories for bituminous membranes ...

    2012-06-28  A complete video to show the application of Eterno Ivica roofing accessories for bituminous membranes.

  • Standard Practice for Sampling Bituminous Materials1

    with instructions for use is shown in Fig. 2. NOTE 2—Most bituminous materials in the liquid state are of such viscous and adhesive character that, after normal emptying of a container by pouring, the container retains enough material to cause significant contamination of any second samples secured before the container was thoroughly cleaned. The aforementioned properties of bituminous mate ...

  • training.gov.au - RIICBS203A - Safely handle bituminous ...

    knowledge of the requirements, procedures and instructions for safe handling of bituminous materials; implementation of requirements, procedures and techniques for the safe, effective and efficient safe handling of bituminous materials ; working with others to undertake and complete the safe handling of bituminous materials that meets all of the required outcomes; consistent timely completion ...

  • TM Asphalt Driveway Maintenance

    • Allow new asphalt to cure at least 6 months before applying a sealer. • Allow all repairs to cure thoroughly prior to sealing. Follow all product label directions. Note: Please read entire product labels for complete instructions. BLACK BLACK TM Asphalt Driveway Maintenance Henry® Company 999 N. Sepulveda Blvd., Ste 800 El Segundo, CA 90245

  • Standard Practice for Sampling Bituminous Materials1

    with instructions for use is shown in Fig. 2. NOTE 2—Most bituminous materials in the liquid state are of such viscous and adhesive character that, after normal emptying of a container by pouring, the container retains enough material to cause significant contamination of any second samples secured before the container was thoroughly cleaned. The aforementioned properties of bituminous mate ...

  • training.gov.au - RIICBS203A - Safely handle bituminous ...

    knowledge of the requirements, procedures and instructions for safe handling of bituminous materials; implementation of requirements, procedures and techniques for the safe, effective and efficient safe handling of bituminous materials ; working with others to undertake and complete the safe handling of bituminous materials that meets all of the required outcomes; consistent timely completion ...

  • Malarkey Roofing Products Built-Up Bituminous Roofing ...

    Install per manufacturer's instructions for asphalt adhesion, applying asphalt at rate of 25 lbs. per 100 sq.ft. (11.3 kg/9.3 sq.m). ... Complete terminations and base flashings and provide temporary seals to prevent water from entering completed sections of the roofing system. 3. Remove and discard temporary seals before beginning work on adjoining roofing. 3.10: BASE SHEET INSTALLATION : A ...

  • Two component bituminous liquid for use with Proofex systems.

    Two component bituminous rubber emulsion with special hydraulically hardening fillers. Properties. Consistency: Paste-like (mixture) Density: Approximately 1.2 g/cm³ (mixture) while fresh: Pot life: Approximately 90 minutes at +20ºC. Application temperature: Approximately: minimum +5ºC up to +35ºC ambient temperature: Primer: Mixed material diluted with water 1:10: Curing: 1 to 3 days ...

  • Application for a Permit to Operate an Asphalt Plant

    R.S.P.E.I. 1988, as it relates to the issuing of a Permit to Operate an Asphalt Plant. If you have any questions about this collection of personal information, you may contact the Environment Division, Prince Edward Island Department of Communities, Land and Environment, (902) 368-5024. Application for a Permit to Operate an Asphalt Plant

  • Reservation Instructions for Members - Asphalt Green

    Reservation Instructions for Members. Reservation Instructions for Members 3. Review the program details and select ENROLL NOW. 4. You will be prompted to sign in to your Asphalt Green account. Reservation Instructions for Members 5. If this is your first time signing in to your Asphalt Green account, you will be required to review and initial the new liability waiver. Follow the instructions ...

  • Presidential Shake ® Shingles - CertainTeed

    The top tier performance of asphalt, the curb appeal of hand-split cedar shake roofing, and the unwavering quality of CertainTeed. An intricate shingle design that creates an architecturally beautiful roof; A rich colour palette to enhance and complement any home exterior; Less expensive than real wood shake, and practically maintenance free; Due to variation in computer monitors and printers ...

  • SECTION 075200 - MODIFIED BITUMINOUS MEMBRANE ROOFING

    Install in asphalt over Limestone ply felts in accordance with manufacturer's instructions and NRCA recommendations. Sheet Flashing: Apply modified bitumen sheet flashing in the angles formed where the roof deck abuts walls, curbs, ventilators, pipes, and other vertical surfaces, and where necessary to make the work water tight, and in accordance with the membrane manufacturer's requirements and ...

  • Revised 10/3/06 Asphalt Cement Price Adjustment Guidelines ...

    The instructions below are for completing the 627-39 form for the Asphalt Price Adjustment. (Only applies to contracts containing 50% adjustment) An ACPA Inspector’s Report shall be completed early on in the project to determine the “begin adjustment date”. Place the letting date on the appropriate line and the date the report is done, once done this will give the date the Price ...